Welcome to our download center. We provide professionally developed method statements, ITP’s, checklists, test reports, risk assessments and other electrical project related documents.
Our documents are provided in editable formats i.e. MS Word & MS Excel files.
You only need to to insert project details and logos etc after which you can submit for client & consultant approvals.
All method statement package contains:
- Method statement
- Inspection & Test Plan ITP
- Checklists
- Risk Assessment
Below is the list of method statements that shall be instantly available through download link.
- Earthing & Bonding System Installation
- Earthing & Lightning Protection System Testing
- Installation Of Diesel Generator Set
- Testing & Commissioning Of Diesel Generator Set
- Installation of Enclosed switches Isolators
- Installation Of Transformers
- Transformer Testing and Commissioning
- Bus Duct and Bus Bar Trunking Installation
- Bus Duct Testing & Commissioning
- Central Battery System CBS Installation Method Statement
- Central Battery System CBS Testing & Commissioning
- Installation Of Flush Floor Trunking System
- Light Fittings Luminaries Exterior & Interior
- Installation of MDB, SMDB, DB, MCC & Capacitor Bank
- Testing and Commissioning of MDB, SMDB, DB, MCC & Capacitor Bank
- Installation of PVC & GI Conduits & Accessories
- Installation Of Underground Duct Banks & Sleeves
- Installation Of UPS & Accessories
- UPS System Testing and Commissioning
- Installation Of Lighting Control System
- Lighting Control System Testing and Commissioning
- Lightning Protection System Installation
- Medium Voltage MV Switchgear Installation
- Medium & Low Voltage Switchgear Testing And Commissioning
- Medium Voltage MV Power Cables & Accessories Installation
- Testing & Commissioning Of MV Power Cables
- Wiring Accessories Installation
- Installation Of Cable Raceways Trays Ladders & Trunking
- Installation Of LV Power Cables and Wires
- Testing of LV Power Cables and Wires
Click below link to download all above mentioned 30 electrical method statements at the cost of 63.95$ only.
Click To Download Electrical Method Statements
If you want to download individual electrical method statement you can visit electrical method statement category.

