Method statement for Installation & Testing of Earthing, Grounding and Lightning Protection System

This Method statement details the procedure of installation & testing of earthing system, grounding systems and lightning protection system. The grounding earthing system and lightning protection system are designed to ensure the complete safety of both persons and equipment throughout the buildings covered under the electrical project scope.

Arrange following material and equipment before starting the earthing and lightning protection installation.

Other References that can be used for technical guide, include:

Project Specification

Shop drawings

Vendor’s recommendations/Guidelines

Erico/Eritech Caldweld™ Exothermic Welding Manual

CADWELD Lightning Protection Connections Catalog Ref -Catalog A1E

CADWELD® Welded Electrical Connections

CADWELD® Welded Electrical Connections, Quick Reference Product Guide, Pocket Catalog Ref. E782C-NAEN

Type of earthing system connections:

Material storage and handling

Storage of exothermic welding materials should be in a clean, dry, “NO SMOKING” area and should be restricted to access by authorized personnel only.

Storage condition shall be such that exothermic welding materials are not subject to rough handling or physical damage. Storage shall be in cool place and in condition no humidity and moisture.

All boxes or container of material should be stored in accordance with container (carton) or label marking “This Side Up”

These materials must be stored under shelter to protect the boxes from the elements and raised to protect them from dampness or wet surface.

Detail Procedure of Installation of Grounding System

General & Safety Precautions

Do not connect items except as detailed in instruction sheets. Failure to comply with these instructions may result in improper and unsafe connections, damage to items being connected, bodily injury and property damage.

Do not use worn or broken equipment which could cause current leakage.

Do not alter equipment or material without manufacturer authorization.

When using CADWELD® do not use welding material package if damaged or not fully intact.

When using CADWELD® PLUS, do not tamper with or disassemble the welding material unit.

Make connections in conformance with CADWELD instructions and all governing codes.

Personnel should be properly trained in the use of this product and must wear safety glasses and gloves. Avoid contact with hot materials.

Advise nearby personnel of welding operations in the area.

Remove or protect fire hazards in the immediate area. Provide adequate ventilation to the work area.

Do not smoke when handling starting material. Avoid direct eye contact with “flash” of light from ignition of starting material.

Welding material is an exothermic mixture and reacts to produce hot molten material with temperatures in excess of 1400°C (2500°F) and a localized release of smoke. These materials are not explosive. Ignition temperatures are in excess of 900°C (1650°F) for welding material.

Adhering to the CADWELD welding procedures will minimize risk of burns and fire caused by hot molten material spillage. In case of fire, use of water or CO2 will aid in control of burning containers. Large quantities of water will aid in controlling a fire should the exothermic materials become involved. Water should be applied from a distance.

Make sure there is proper mold fit and assembly of equipment.

Avoid moisture and contaminants in mold and materials being welded. Contact between hot molten metal and moisture or contaminants may result in spewing of hot material.

Base material thickness must be sufficient for the size and type of connection being made to prevent melt-through and leakage of hot molten metal.

Applications or conditions may exist which require special considerations. The following are examples, but are not intended to be a complete listing of applications/conditions.

Installation of Exothermic Welding System for lightning protection & earthing system

The mould crucible with suitable size shall be used for exothermic welding. The following procedures shall be followed before conducting the exothermic welding.

Earthing Cable Installation:

The earthing conductor, bare copper cable shall be installed as per approved shop drawing.

Ensure that the copper cable is straight (not wavy) so that it fits nicely into the exothermic mould prior to the exothermic welding.

Ensure that the copper cable is free of dirt / oil and dry keeping.

Earth Rod Installation:

Earth Pit Installation

Install the inspection pit and ensure that it is flush with the external ground / road level. Ensure that the earth pit is free from dirt and rubbish.

Execution work for Earthing of Lightning Protection

Handling of chemicals to reduce soil resistivity

Procedure of installation of Lightning Protection system:

Standard Requirements for earthing system

Down conductor for air terminal (ESE type) shall be connected to earthing rods to ensure direct connection to earth of any stroke current before interconnection with the general Grounding System.

All equipment connected to power supply must be grounded.

All metal parts, structural steel, cable trays, piping, reinforced concrete must be grounded.

All joints shall be according to shop drawing.

Safety control:

Inspection and Testing Procedures

The Grounding and Lightning Protection System shall be given a visual inspection by the Engineer during the installation.

The Contractor should not allow any backfilling of trenches or pits where these systems are installed before inspection by the Engineer and the appropriate documents are signed.

Material delivered shall be inspected under the Engineer’s supervisor about size, quality and quantity.

After performing, works shall be inspected. Inspection of lightning should be included two steps: check underground system and general. For equipment fitted inside structural work or fix underground shall be checked and inspect before backfilling.

Check Grounding and Lightning Protection.

Shop-drawing approved.

Material approved.

Test method of visual:

Field testing of Earthing and Lightning Protection System

Grounding rods shall be tested for ground resistance value before any wire is connected. The test shall be performed in normal dry weather, not less than 48 hours after rainfall.

Ground resistance shall also be measured for each piece of equipment to the ground electrode. Testing shall be with a portable ground testing megger for each ground or group of grounds. The instrument shall be equipped with ammeter reading directly in Ohms or fractions thereof to indicate the ground value of the electrode under test.

All test equipment including test meter shall be provided and one copy of the ground megger manufacturer’s directions, including the method shall be provided.

The minimum resistance based on the allowable capacity of the conductor shall be as indicated in the following table:

 Resistance tests table

 

Amperes/ Ohms
25 through  50 250000
51 through  100 100000
101 through  200 50000
201 through   400 25000
401 through   800 12000
Over   800 5000

The earth resistance shall be measured either soil resistivity testing or earth resistance testing method.

 Soil resistivity testing based on Wenner method

Equipment and procedure for soil resistivity:

The test instrument is used Mega Digital Earth Tester. The instrument is connected to the electrodes as detail below:

Four electrodes are driven into the ground, in a straight line with equal spacing between them.

Let the spacing be called ‘a’.

 

The soil resistivity can then be calculated using the equation:

ƒ = 2 x 3.14 x a x R

Where ƒ = soil resistivity (ohm meters)

a = electrode spacing (meters)

R = measured resistance (ohms)

Soil Resistivity Testing Procedure

After finishing the installation works of Grounding and Lightning Protection System, inspection shall be carried out and approved by relative parties such as: Consultant, Main contractor. We can ask the Experiment Center for inspection the whole system and then issue the Certificate Completion.

Safety control method:

The safety procedure generally has to be applied for all Engineers, Supervisors, and Workers as following bellow:

Working safely during exothermic welding:

Working at height: