Download Editable Documents

Construction Risk Assessment for Project Civil Works - Covering 39 Activities

SKU 00203
Save this product for later
Share this product with your friends
In stock
$19.99
Construction Risk Assessment for Project Civil Works - Covering 39 Activities
Product Details

Now you can download the full package of editable construction project risk assessment for any type of civil project works.

This package covers 39 activities that are involved in most of the civil construction projects.

Each project task risk assessment file contains the details about activity and its sub activities itself, hazards, consequences, actual risk and residual risk after implementing the suggested control measures.

The sequence of project risk assessment involves in most cases as under:

  • Delivery and storage
  • Mobilization and preparation
  • Application or construction
  • House Keeping

There are other sections that depends upon the activity itself like working at height, permit to work, confined space, hot works, lone works and excavations etc.

Additionally each file contains risk matrix to calculate the risk rating as applicable for any organization or project.

Construction Project Risk Assessment

At the end of risk assessment table a general section is available that covers many simple but mandatory requirements, like:

Persons in danger: Workers undertaking the work. Persons passing the site location/ truck routes, e.g. members of the public and persons in the Vehicles.

Personal protective equipment: Safety Helmet, Gum Boot, Proper Gloves & Safety Goggles

Information, instruction and training: All personnel in the team are to be made aware of the safe systems of work. Ensure that good house keeping standard is maintained through out. Training and experience for personnel to use electrical equipments and vibratory equipments. Educate the personnel to handle chemicals such as concrete.

Emergency procedures: Site emergency procedures should make provision for the rescue of individuals from heights. First-aid facilities should be available to cope with any significant injuries that may arise from the work.

Monitoring and review: Work should be monitored by Foreman and charge hand who are trained to ensure that any additional precautions or equipment required are provided.

How to Download Construction Risk Assessments

The full civil works construction risk assessment package covers below civil activities.

  1. Acrylic Rubber Filled Coating
  2. Aluminium Canopy Installation
  3. Aluminum Cladding Installation
  4. Anti Termite Treatment
  5. Automatic Sliding Door Installation
  6. Base and Wall Cabinets
  7. Black Bitumen Paint
  8. Blinding Concrete
  9. Canopies Installation
  10. Carpets on Walls
  11. Concrete Repair Works
  12. Concrete Works Sub Structure
  13. Concrete Works Superstructures
  14. Coring & Cutting Of RCC Walls
  15. Curtain Wall & Glazing Installation
  16. Decorative Gravel Fill
  17. Excavation and Backfilling
  18. False Ceiling Installation
  19. Galvanized Wire Screen Installation
  20. General Demolition Works
  21. Handrail Installation
  22. Internal Paintings Works
  23. Louver Installation
  24. Painting Works External
  25. Plastering Work
  26. RCC Columns & Walls
  27. Reinforcing Bars Installation
  28. Roof Drains Installation
  29. Screeding Works
  30. Steel Structure and decking slab
  31. Stone Works
  32. Suspended Ceilings Installation
  33. Tensile Fabric Shades Fabrication & Installation
  34. Timber Doors Fabrication & Installation
  35. Underground Chemical Waste Tanks Installation
  36. Wall Panels Installation
  37. Water Proofing in Wet Areas
  38. Wire Screen Installation
  39. Wooden Floor Finishes