Below is a precise electrical installation method statement that covers installation of main distribution board and MCC panel board in compliance with the approved design, drawings, manufacturer instructions and material submittals. The electrical or MEP project manager is overall responsible for the
Read More
Objective of this method statement is to explain the procedure for the Installation of Cathodic Protection System for a construction project in compliance with local and international regulations. This method statement identifies the work related general steps and necessary arrangements, scope of
Read More
The electrical method statement below provides the brief steps to be carried out during the AC High voltage testing. Method statement applies to the testing of 11 KV switchgear. Testing and commissioning engineer / responsible person shall obtain all necessary clearances and
Read More
Fluorescent light electronic ballast provides initial high voltage for discharging the gas inside the fluorescent lamps/bulbs. Ballast converts power frequency to very high frequency that initializes gas discharge process by controlling voltage and current through the lamps. There are different types of light
Read More
The purpose of this procedure is to ensure that all works regarding electrical junction box and supports installation for electrical instrumentation works shall be done in accordance with the applicable local standards and all other applicable international codes and standards. Scope of
Read More
Prior to commencement of work, all shop drawings will be submitted for approval by consultant/client. Shop drawings will show the layout of pipe and cables as well as the section drawings. Only approved shop drawing will be used for installation. All materials
Read More