Category Archives: Electrical Method Statements

You can find helpful method statements for electrical engineering people. Especially for the electrical engineers working in construction industry.

Interior and Exterior Lighting Installation Method Statement

Below method statement covers installation and connection of all interior and exterior lighting, lighting control devices and wiring devices according to the approved shop drawings, project specifications and other related codes. One of the purpose of this method statement is to coordinate the exact location and position of all lighting fixtures, switches, outlet boxes and… Read More »

Uninterruptible UPS Power Supply System Installation Testing & Commissioning Method Statement

Below document covers the uninterruptible power supply UPS system installation, testing and commissioning method statement. Before starting the UPS installation work, user manual must be thoroughly read and understood. Applicable safety instructions and warnings must be discussed and appropriate measures must be taken. It is strictly recommended that trained service engineer from manufacturer or authorised… Read More »

Installation Method Statement for Interior Lighting System Light Fittings & Luminaries

Before start of the installation works exact locations of luminaries will be checked and it should be as per approved RCP (reflected ceiling plan) drawing. Installation shall be carried out by skilled and suitably experienced electricians under supervision of highly competent site supervisors and engineers to ensure the correctness and best quality of installation. Light… Read More »

Electrical Installation Method Statement for MDB and MCC

Below is a precise electrical installation method statement that covers installation of main distribution board and MCC panel board in compliance with the approved design, drawings, manufacturer instructions and material submittals. The electrical or MEP project manager is overall responsible for the implementation of this procedure and any relevant documents/standards. Site Engineer will be responsible… Read More »

Cathodic Protection System Installation Method Statement

Objective of this method statement is to explain the procedure for the Installation of Cathodic Protection System for a construction project in compliance with local and international regulations. This method statement identifies the work related general steps and necessary arrangements, scope of this document includes preparation of equipment, manpower, installation, rebar continuity test for critical… Read More »