Category Archives: Electrical Method Statements

You can find helpful method statements for electrical engineering people. Especially for the electrical engineers working in construction industry.

Method Statement for Variable Frequency Drives VFD Testing and Commissioning

In one of our previous post we mentioned details about the variable frequency drives principle. Now this page provides you the method of testing and commissioning of VFD drives in simple steps. Remember before testing all installation and construction completion should be approved. Power Connection Requirements: Megger the incoming and outgoing power cable & connections for… Read More: Method Statement for Variable Frequency Drives VFD Testing and Commissioning »

Procedure for Pulling Horizontal Data & Voice Cables in Conduits Using Fishtape

Overview Horizontal cable is installed between the telecommunications closet and the work area outlets for workstations. It supports many different kinds of information for its users: Voice communications Data communications Other building information systems (such as CATV, IPCCTV) Pulling horizontal cabling is one of the most important jobs of a successful installation. Because the cable… Read More: Procedure for Pulling Horizontal Data & Voice Cables in Conduits… »

How To Install Low Voltage Switchgear Panels

The apparatus used for switching , controlling & protecting the electrical circuits & equipment is known as switchgear. The switchgear equipment is essentially used with switching & interrupting currents either under normal or abnormal operating conditions. A switchgear consists of devices such as switches , fuses , circuit breakers , relays etc. Basically every electric… Read More: How To Install Low Voltage Switchgear Panels »

Cable Tray Ladder Trunking Wire Basket Installation Guidelines

What Are Cable Trays? An assembly of units/sections with associated fittings that form a rigid structural system to securely fasten or support cables. Think of a roadway bridge that supports traffic. Cable Tray Systems must provide protection to life & property against faults caused by electrical disturbances Lighting and failures which are part of the… Read More: Cable Tray Ladder Trunking Wire Basket Installation Guidelines »

Method Statement for Installation of Isolated Power Supply IPS Units

Below is given a brief method statement for Installation of Isolated Power Supply units or also called IPS Units. Pre installation requirements before commencing the installation work at site are: Operative to attend any site induction provided by the client. Check the  power  cables  and  earth  cable  sizes  are  done  as  per  approved drawings. Conduits,… Read More: Method Statement for Installation of Isolated Power Supply IPS Units »

Capacitor Bank Installation Method Statement

Installation of capacitor bank shall be carried out in accordance to project specifications and approved drawings and technical submittals etc. Installation will be carried out by skilled and suitably experienced electricians under supervision of highly competent site supervisors and engineers to ensure the correctness and quality of the work. Prior to dispatch of capacitor bank… Read More: Capacitor Bank Installation Method Statement »