The purpose of this method statement is to define the sequence and working methodology of the positioning and installation of UPS system especially Chloride 80 Net System. Upon receipt of the UPS system and accessories at site, necessary precautions shall be taken
Read More
All electrical checks and tests shall be conducted as per the manufacturer’s drawings/manuals, relevant codes of installation and below given commissioning check lists. The electrical installer/contractor shall also carry out additional tests if called for in the project electrical specifications. Contractor shall
Read More
The lighting system installation work shall cover the supply and installation of lighting system equipment such as Main lighting distribution boards (MLDBs), lighting distribution boards (LDBs), receptacles, light control switches, ceiling fans, lighting wires, conduits, junction boxes, lighting poles, towers, etc. Lighting
Read More
This method is to describe the minimum requirements for earthing conductor installation including materials receiving, storing, and installation. The electrical procedure will ensure that the requirements of underground earthing installation works are met in accordance to the codes requirements and contract specifications.
Read More
The Octal Number System is another type of computer and digital base number system. Octal Number System is very similar in principle to the previous hexadecimal numbering system except that in Octal, a binary number is divided up into groups of only
Read More
All the people living or working in residential, commercial and industrial installations, particularly the operators and personnel who are in close operation and contact with electrical systems and machineries, should essentially be protected against possible electrification. To achieve this protection, earthing system