Horizontal Directional Drilling Method for Underground Trenchless Cabling Installation

Horizontal Directional Drilling is a guided horizontal boring system capable of installing utilities such as steel pipes and underground cables. Its primary application is in developed areas where surface disruption is a serious consideration, not only because of cost but also because of smooth traffic flow, customer satisfaction and environmental friendly. The horizontal drilling technology… Read More: Horizontal Directional Drilling Method for Underground Trenchless Cabling Installation »

PVC Electrical Conduit Installation Method for Surface Slab and Walls

This document defines the methods to be used to ensure that the electrical works to be conducted at a project site are in compliance with the approved designs and approved materials. The method of statement covers the procedure for Material Delivery Inspection, Installation and Inspection of PVC conduit embedded in wall, false ceiling or slab.… Read More: PVC Electrical Conduit Installation Method for Surface Slab and Walls »

Electrical Isolation in Distribution Board Safework Procedure

The purpose of this method is to highlight safe working practices for electrical isolation which is similar as lock out tag out. Operators must wear necessary PPE as required by local conditions and task specific risk assessment. Before start of the electrical isolation work: Ensure that you are qualified to carry out this task. No… Read More: Electrical Isolation in Distribution Board Safework Procedure »

MCQ Multiple Choice Questions Transmission Lines Communications Engineering

Below you can find MCQ’s or Multiple Choice Questions related to the Transmission Lines in the field of Communications Engineering. Correct answers are in red & bold font. 1. What determines the velocity factor in transmission line? a) The termination impedance b) The center conductor resistivity c) Dielectrics in the line d) The termination impedance… Read More: MCQ Multiple Choice Questions Transmission Lines Communications Engineering »

Installation and Termination Method of 132 kV Cables and Fiber Optic Cables

The purpose of this document is to specify the procedure for the various activities in the installation of 132 kV cables and fiber optic Cables. The instructions of operation and maintenance manual must be observed for whole of the process for the cable laying installation and termination. Roles & Responsibilities Project Manager: Lead all construction… Read More: Installation and Termination Method of 132 kV Cables and Fiber… »

UPS Battery Charger Testing Commissioning Method Statement

This procedure provides a safe, standardized approach for the initial inspection, checkout, testing, and data documentation of Uninterruptible Power Supply (UPS) and chargers during the commissioning phase. These tests are intended to check the board and its constituent parts for correct operation. The battery charger is generally used to energize the batteries. Battery charger shall… Read More: UPS Battery Charger Testing Commissioning Method Statement »