Download Electrical Method Statements

By | October 30, 2023


Welcome to our download center. We provide professionally developed method statements, ITP’s, checklists, test reports, risk assessments and other electrical project related documents.

Our documents are provided in editable formats i.e. MS Word & MS Excel files.

You only need to to insert project details and logos etc after which you can submit for client & consultant approvals.

All method statement package contains:

  • Method statement
  • Inspection & Test Plan ITP
  • Checklists
  • Risk Assessment

Below is the list of method statements that shall be instantly available through download link.

  1. Earthing & Bonding System Installation
  2. Earthing & Lightning Protection System Testing
  3. Installation Of Diesel Generator Set
  4. Testing & Commissioning Of Diesel Generator Set
  5. Installation of Enclosed switches Isolators
  6. Installation Of Transformers
  7. Transformer Testing and Commissioning
  8. Bus Duct and Bus Bar Trunking Installation
  9. Bus Duct Testing & Commissioning
  10. Central Battery System CBS Installation Method Statement
  11. Central Battery System CBS Testing & Commissioning
  12. Installation Of Flush Floor Trunking System
  13. Light Fittings Luminaries Exterior & Interior
  14. Installation of MDB, SMDB, DB, MCC & Capacitor Bank
  15. Testing and Commissioning of MDB, SMDB, DB, MCC & Capacitor Bank
  16. Installation of PVC & GI Conduits & Accessories
  17. Installation Of Underground Duct Banks & Sleeves
  18. Installation Of UPS & Accessories
  19. UPS System Testing and Commissioning
  20. Installation Of Lighting Control System
  21. Lighting Control System Testing and Commissioning
  22. Lightning Protection System Installation
  23. Medium Voltage MV Switchgear Installation
  24. Medium & Low Voltage Switchgear Testing And Commissioning
  25. Medium Voltage MV Power Cables & Accessories Installation
  26. Testing & Commissioning Of MV Power Cables
  27. Wiring Accessories Installation
  28. Installation Of Cable Raceways Trays Ladders & Trunking
  29. Installation Of LV Power Cables and Wires
  30. Testing of LV Power Cables and Wires

Click below link to download all above mentioned 30 electrical method statements at the cost of 63.95$ only.


If you want to download individual electrical method statement you can visit electrical method statement category.