After reading this article, you shall be able to: Convert between binary and decimal numbers. Convert between decimal and binary fractions. Convert between binary and hexadecimal numbers. Convert between decimal and hexadecimal numbers. Convert between binary and octal numbers. Convert between binary and BCD numbers. The decimal number system is fine for calculations done by… Read More: Binary, Hexadecimal, Octal, and BCD Numbers »

Switchgear Panels Energization and De-Energization Procedure – Electrical Services Commissioning

This document covers the livening up and isolation of electrical supplies from the incoming power supply to the final circuit. The aim is to have a safe procedure for the livening up electrical supplies during the commissioning period and a safe procedure for isolating electrical supplies where remedial works are required due to defects found… Read More: Switchgear Panels Energization and De-Energization Procedure – Electrical Services Commissioning »

Hexadecimal Number System

The one main disadvantage of binary numbers is that the binary string equivalent of a large decimal base-10 number can be quite long. When working with large digital systems, such as computers, it is common to find binary numbers consisting of 8, 16 and even 32 digits which makes it difficult to both read and… Read More: Hexadecimal Number System »

Electrical Switchgear Installation Procedure – Medium Voltage MV Panel

This page provides steps for successful installation of medium voltage electrical switchgear panel on a construction project or building. The method of statement describes the procedure for material delivery inspection, installation and inspection of MV switch gears. Project Manager is the overall responsible person for the process of implementation of the work methods. The Construction… Read More: Electrical Switchgear Installation Procedure – Medium Voltage MV Panel »

Method statement for Installation & Testing of Earthing, Grounding and Lightning Protection System

This Method statement details the procedure of installation & testing of earthing system, grounding systems and lightning protection system. The grounding earthing system and lightning protection system are designed to ensure the complete safety of both persons and equipment throughout the buildings covered under the electrical project scope. Arrange following material and equipment before starting… Read More: Method statement for Installation & Testing of Earthing, Grounding and… »

BMS Building Management System Testing & Commissioning Method

The purpose of this document is to detail the testing & commissioning procedures of the Building Management System BMS. Below is list of some necessary tools & instruments. Calibration certificates of the testing equipment will be produced during testing and commissioning. Laptop with Ethernet cross cable Multi-meter. (A valid test/calibration certificate will be available for… Read More: BMS Building Management System Testing & Commissioning Method »