Installation and Termination Method of 132 kV Cables and Fiber Optic Cables

The purpose of this document is to specify the procedure for the various activities in the installation of 132 kV cables and fiber optic Cables. The instructions of operation and maintenance manual must be observed for whole of the process for the cable laying installation and termination. Roles & Responsibilities Project Manager: Lead all construction… Read More: Installation and Termination Method of 132 kV Cables and Fiber… »

UPS Battery Charger Testing Commissioning Method Statement

This procedure provides a safe, standardized approach for the initial inspection, checkout, testing, and data documentation of Uninterruptible Power Supply (UPS) and chargers during the commissioning phase. These tests are intended to check the board and its constituent parts for correct operation. The battery charger is generally used to energize the batteries. Battery charger shall… Read More: UPS Battery Charger Testing Commissioning Method Statement »

Cable Pulling Laying Installation Termination and Testing Method Statement

The purpose of this electrical method statement is to describe the methodology which contractor is adopting during the execution of the cable installation work. Further following this method will ensure that work is done in controlled and safe manner as per project scope complying with specifications, Standards and procedures. The scope of this electrical work… Read More: Cable Pulling Laying Installation Termination and Testing Method Statement »

Cable Tray Trunking & Ladder Installation Method for Projects

The purpose of this article is to define the sequence and methodology for the installation of electrical cable trays, cable trunking, cable raceways and boxes, junction and pull boxes. The method gives details of how the work will be carried out and what health and safety issues and controls that are involved. The content of… Read More: Cable Tray Trunking & Ladder Installation Method for Projects »

Method Statement For Installation Testing and Commissioning Of MATV Distribution System

This electrical method statement covers the installation, testing and commissioning procedure for the master antenna or MATV Distribution system. All the materials will be as approval from the consultant engineer and installation & routing will be as per the shop drawings approvals for MATV system. Minimum tools and  equipment’s for the installation and testing of… Read More: Method Statement For Installation Testing and Commissioning Of MATV Distribution… »

Overhead Power Transmission Line Route Selection Considerations

This article is very helpful for electrical engineers working on overhead power line design and any kind of transmission line related business. Overhead transmission lines play very vital role in our lives because if transmission of energy is not efficient it results power disruptions and losses of power itself. Below are some of the important… Read More: Overhead Power Transmission Line Route Selection Considerations »