Electrical Isolation in Distribution Board Safework Procedure

The purpose of this method is to highlight safe working practices for electrical isolation which is similar as lock out tag out. Operators must wear necessary PPE as required by local conditions and task specific risk assessment. Before start of the electrical isolation work: Ensure that you are qualified to carry out this task. No… Read More »

MCQ Multiple Choice Questions Transmission Lines Communications Engineering

Below you can find MCQ’s or Multiple Choice Questions related to the Transmission Lines in the field of Communications Engineering. Correct answers are in red & bold font. 1. What determines the velocity factor in transmission line? a) The termination impedance b) The center conductor resistivity c) Dielectrics in the line d) The termination impedance… Read More »

Security System Installation Procedure Including CCTV Installation

This electrical installation procedure covers the nature and type of work for Security System installation as per approved material submittal, site requirements and manufacturers’ recommendations. Method also covers frequency of which the site inspections are to be carried out. Electrical project and site engineers are responsible for ensuring that all works are carried out as… Read More »

Installation Of LV Switchgear

This procedure defines the methods to be adopted for the installation of  LV Switchgear panels on a project. Document will ensure that the installation works at site are in compliance with the approved shop drawing, specifications, manufacturer manuals and approved material submittals. Method statement also covers the procedure for material delivery inspection, storage in addition… Read More »

Installation and Termination Method of 132 kV Cables and Fiber Optic Cables

The purpose of this document is to specify the procedure for the various activities in the installation of 132 kV cables and fiber optic Cables. The instructions of operation and maintenance manual must be observed for whole of the process for the cable laying installation and termination. Roles & Responsibilities Project Manager: Lead all construction… Read More »

UPS Battery Charger Testing Commissioning Method Statement

This procedure provides a safe, standardized approach for the initial inspection, checkout, testing, and data documentation of Uninterruptible Power Supply (UPS) and chargers during the commissioning phase. These tests are intended to check the board and its constituent parts for correct operation. The battery charger is generally used to energize the batteries. Battery charger shall… Read More »