Tag Archives: ATS Method Statement

Automatic Transfer Switches ATS Installation Method Statement

The purpose of this method statement is to define the sequence and methodology for the installations of Automatic Transfer Switches and bypass-isolation switch ATS & BPS. Prior to commencement of work, shop drawing will be processed and submitted for approval by the Engineer. Shop drawing will include front and side views of enclosure, Overall dimensions,… Read More: Automatic Transfer Switches ATS Installation Method Statement »