Fiber Optic Cable Installation Method Statement

optical fiber splicing process

Below is given the fiber optic cable installation method statement for performing the installation of optical fiber cabling system for any kind and size of project. The method covers the steps from receiving the materials on the installation site and cable pulling

2021
Feb
12

Installation and Termination Method of 132 kV Cables and Fiber Optic Cables

Installation and Testing Method of 132 kV Cables and Fiber Optic Cables

The purpose of this document is to specify the procedure for the various activities in the installation of 132 kV cables and fiber optic Cables. The instructions of operation and maintenance manual must be observed for whole of the process for the