The purpose of this document is to specify the procedure for the various activities in the installation of 132 kV cables and fiber optic Cables. The instructions of operation and maintenance manual must be observed for whole of the process for the
Read More
This procedure provides a safe, standardized approach for the initial inspection, checkout, testing, and data documentation of Uninterruptible Power Supply (UPS) and chargers during the commissioning phase. These tests are intended to check the board and its constituent parts for correct operation.
Read More
The purpose of this electrical method statement is to describe the methodology which contractor is adopting during the execution of the cable installation work. Further following this method will ensure that work is done in controlled and safe manner as per project
Read More
The purpose of this article is to define the sequence and methodology for the installation of electrical cable trays, cable trunking, cable raceways and boxes, junction and pull boxes. The method gives details of how the work will be carried out and
Read More
This electrical method statement covers the installation, testing and commissioning procedure for the master antenna or MATV Distribution system. All the materials will be as approval from the consultant engineer and installation & routing will be as per the shop drawings approvals
Read More
This article is very helpful for electrical engineers working on overhead power line design and any kind of transmission line related business. Overhead transmission lines play very vital role in our lives because if transmission of energy is not efficient it results
Read More