Category Archives: Electrical Method Statements

You can find helpful method statements for electrical engineering people. Especially for the electrical engineers working in construction industry.

Emergency Lighting System Installation Method Statement

You can find below Emergency Lighting System Installation Method Statement in steps that covers the pre-installation steps and after that installation procedure. Pre-installation checks for Emergency Lighting System Ensure the materials, equipment and components are as per approved material submittal and as per technical specification. Make sure that the emergency lighting drawings are current and… Read More: Emergency Lighting System Installation Method Statement »

Fiber Optic Cable Installation Method Statement

Below is given the fiber optic cable installation method statement for performing the installation of optical fiber cabling system for any kind and size of project. The method covers the steps from receiving the materials on the installation site and cable pulling as per the approved shop drawings and project specifications. Before starting the fiber… Read More: Fiber Optic Cable Installation Method Statement »

Installation Method Statement for Small Power System

Installation of small power system shall be carried out in accordance to Contract Specification and will be as per approved construction methodology, shop drawings and checklists. Installation shall be carried out by skilled and suitably experienced electricians under supervision of highly competent site supervisors and engineers to be ensured the correctness and quality of installation.… Read More: Installation Method Statement for Small Power System »

method statement for installation of diesel generator

Prior to commencement of diesel generator DG set installation work all shop drawing will be submitted for approval and approval will be obtained from the consulting engineer. Approved shop drawing will show the routes with reference numbers as well as the supporting requirements. Only approved shop drawing will be used at the site for installation.… Read More: method statement for installation of diesel generator »

Interior and Exterior Lighting Installation Method Statement

Below method statement covers installation and connection of all interior and exterior lighting, lighting control devices and wiring devices according to the approved shop drawings, project specifications and other related codes. One of the purpose of this method statement is to coordinate the exact location and position of all lighting fixtures, switches, outlet boxes and… Read More: Interior and Exterior Lighting Installation Method Statement »

Uninterruptible UPS Power Supply System Installation Testing & Commissioning Method Statement

Below document covers the uninterruptible power supply UPS system installation, testing and commissioning method statement. Before starting the UPS installation work, user manual must be thoroughly read and understood. Applicable safety instructions and warnings must be discussed and appropriate measures must be taken. It is strictly recommended that trained service engineer from manufacturer or authorised… Read More: Uninterruptible UPS Power Supply System Installation Testing & Commissioning Method… »