Category Archives: Electrical Method Statements

You can find helpful method statements for electrical engineering people. Especially for the electrical engineers working in construction industry.

BMS Building Management System Testing & Commissioning Method

The purpose of this document is to detail the testing & commissioning procedures of the Building Management System BMS. Below is list of some necessary tools & instruments. Calibration certificates of the testing equipment will be produced during testing and commissioning. Laptop with Ethernet cross cable Multi-meter. (A valid test/calibration certificate will be available for… Read More: BMS Building Management System Testing & Commissioning Method »

Method Statement for Installation & Testing of Electrical Distribution Board

This method statement will help the electrical engineers and supervisors for the installation of distribution board for an electrical project. Additionally site team will need detailed information of all aspects associated with the installation process in order to complete the job inline with the contract or project requirements, specifications and approved electrical drawings. Before the… Read More: Method Statement for Installation & Testing of Electrical Distribution Board »

Method Statement for Testing & Commissioning Of Enclosed Bus Assemblies

The purpose of this method statement is to outline the sequence and method of Testing & Commissioning of Bus Bar Trunking system. Following tools and equipment shall be arranged before the activity. Earth tester Multimeter I Continuity tester Megger Tester Technician’s tools Calibration certificates will be provided during testing and commissioning. Important: Ensure equipment is… Read More: Method Statement for Testing & Commissioning Of Enclosed Bus Assemblies »

3 way switch wiring and its operation

3 way switch is a lighting control procedure that is very much useful to turn “off” or turn “on” a lighting fixture from two different locations. Since there are 3 conductors connecting the switches in a 3 way light switch wiring we call this three way switch. Before understanding the principle or operation of a… Read More: 3 way switch wiring and its operation »

Electrical Cabling and House Wiring Procedure

This document defines the method for electrical house wiring for any kind of building or project in order to ensure that the works to be conducted at site are in compliance with the approved designs and approved materials. You will need following tools before starting the house wiring: Measuring tape and setting out markers Cable… Read More: Electrical Cabling and House Wiring Procedure »

Download Electrical Method Statements

Welcome to our download center. We provide professionally developed method statements, ITP’s, checklists, test reports, risk assessments and other electrical project related documents. Our documents are provided in editable formats i.e. MS Word & MS Excel files. You only need to to insert project details and logos etc after which you can submit for client… Read More: Download Electrical Method Statements »