Category Archives: Electrical Method Statements

You can find helpful method statements for electrical engineering people. Especially for the electrical engineers working in construction industry.

Method Statement for Underground Earthing Works

This method is to describe the minimum requirements for earthing conductor installation including materials receiving, storing, and installation. The electrical procedure will ensure that the requirements of underground earthing installation works are met in accordance to the codes requirements and contract specifications. Procedure will also make sure that the electrical works are carried out in… Read More: Method Statement for Underground Earthing Works »

Earthing System Concept Components and Types

All the people living or working in residential, commercial and industrial installations, particularly the operators and personnel who are in close operation and contact with electrical systems and machineries, should essentially be protected against possible electrification. To achieve this protection, earthing system of an installation is defined, designed and installed according to the standard requirements.… Read More: Earthing System Concept Components and Types »

Horizontal Directional Drilling Method for Underground Trenchless Cabling Installation

Horizontal Directional Drilling is a guided horizontal boring system capable of installing utilities such as steel pipes and underground cables. Its primary application is in developed areas where surface disruption is a serious consideration, not only because of cost but also because of smooth traffic flow, customer satisfaction and environmental friendly. The horizontal drilling technology… Read More: Horizontal Directional Drilling Method for Underground Trenchless Cabling Installation »

PVC Electrical Conduit Installation Method for Surface Slab and Walls

This document defines the methods to be used to ensure that the electrical works to be conducted at a project site are in compliance with the approved designs and approved materials. The method of statement covers the procedure for Material Delivery Inspection, Installation and Inspection of PVC conduit embedded in wall, false ceiling or slab.… Read More: PVC Electrical Conduit Installation Method for Surface Slab and Walls »

Electrical Isolation in Distribution Board Safework Procedure

The purpose of this method is to highlight safe working practices for electrical isolation which is similar as lock out tag out. Operators must wear necessary PPE as required by local conditions and task specific risk assessment. Before start of the electrical isolation work: Ensure that you are qualified to carry out this task. No… Read More: Electrical Isolation in Distribution Board Safework Procedure »

Solar Panel Installation Methods on Roof Top

When doing solar panel installation on roof tops there are structural considerations to be investigated and analyzed. Solar panels can be placed on new or existing buildings. Solar panels can easily and inexpensively be incorporated at the time of design for new or future construction. The structural elements will need to accommodate the additional loading… Read More: Solar Panel Installation Methods on Roof Top »