Category Archives: Electrical Method Statements

You can find helpful method statements for electrical engineering people. Especially for the electrical engineers working in construction industry.

IP Telephony System Installation Method Statement

All material used at the project site shall be approved prior to the start of IP Telephony system installation works. Materials and documentation relevant to a particular section of works will be checked by the site/project engineer prior to the commencement of work ensuring that these are of the correct type as reviewed by the… Read More: IP Telephony System Installation Method Statement »

Underground Cable Laying Method Statement

Purpose of this method statement is to outline the sequences and methods of works intended to be used for for laying underground 33 kV power and fiber optic cables including the excavation of trench and backfilling. The electrical contractor has the right to adapt the methods of execution as contained in this document from time… Read More: Underground Cable Laying Method Statement »

Types of Commercial and Home Wiring / Light Switch Wiring

What is a wiring circuit and its components? Two or more conductors (wires) through which a current flows from a source to one or more outlets. The source is where the electrical current originates within the house. Usually the breaker box or breaker panel. A conductor is any type material used to carry electrical current.… Read More: Types of Commercial and Home Wiring / Light Switch Wiring »

Method Statement for UPS System Installation

The purpose of this method statement is to define the sequence and working methodology of the positioning and installation of UPS system especially Chloride 80 Net System. Upon receipt of the UPS system and accessories at site, necessary precautions shall be taken for unloading, shifting & storage, as follows: UPS system and components delivered at… Read More: Method Statement for UPS System Installation »

Electrical Testing and Commissioning General Requirements & Checklists

All electrical checks and tests shall be conducted as per the manufacturer’s drawings/manuals, relevant codes of installation and below given commissioning check lists. The electrical installer/contractor shall also carry out additional tests if called for in the project electrical specifications. Contractor shall carry out insulation resistance tests by meggers of following rating. (a) Control circuits… Read More: Electrical Testing and Commissioning General Requirements & Checklists »

Technical Requirements for Lighting System Installation Work

The lighting system installation work shall cover the supply and installation of lighting system equipment such as Main lighting distribution boards (MLDBs), lighting distribution boards (LDBs), receptacles, light control switches, ceiling fans, lighting wires, conduits, junction boxes, lighting poles, towers, etc. Lighting company shall carry out the installation of various lighting equipment as indicated in… Read More: Technical Requirements for Lighting System Installation Work »