This document covers the livening up and isolation of electrical supplies from the incoming power supply to the final circuit. The aim is to have a safe procedure for the livening up electrical supplies during the commissioning period and a safe procedure
Read More
This page provides steps for successful installation of medium voltage electrical switchgear panel on a construction project or building. The method of statement describes the procedure for material delivery inspection, installation and inspection of MV switch gears. Project Manager is the overall
Read More
This Method statement details the procedure of installation & testing of earthing system, grounding systems and lightning protection system. The grounding earthing system and lightning protection system are designed to ensure the complete safety of both persons and equipment throughout the buildings
Read More
The purpose of this document is to detail the testing & commissioning procedures of the Building Management System BMS. Below is list of some necessary tools & instruments. Calibration certificates of the testing equipment will be produced during testing and commissioning. Laptop
Read More
This method statement will help the electrical engineers and supervisors for the installation of distribution board for an electrical project. Additionally site team will need detailed information of all aspects associated with the installation process in order to complete the job inline
Read More
The purpose of this method statement is to outline the sequence and method of Testing & Commissioning of Bus Bar Trunking system. Following tools and equipment shall be arranged before the activity. Earth tester Multimeter I Continuity tester Megger Tester Technician’s tools
Read More