2021
Nov
16

PVC Electrical Conduit Installation Method for Surface Slab and Walls

PVC Electrical Conduit Installation Method for Surface Slab and Walls

This document defines the methods to be used to ensure that the electrical works to be conducted at a project site are in compliance with the approved designs and approved materials. The method of statement covers the procedure for Material Delivery Inspection,

2021
Oct
19

Electrical Isolation in Distribution Board Safework Procedure

The purpose of this method is to highlight safe working practices for electrical isolation which is similar as lock out tag out. Operators must wear necessary PPE as required by local conditions and task specific risk assessment. Before start of the electrical

2021
Sep
26

MCQ Multiple Choice Questions Transmission Lines Communications Engineering

MCQs Multiple Choice Questions Transmission Lines Communications Engineering

Below you can find MCQ’s or Multiple Choice Questions related to the Transmission Lines in the field of Communications Engineering. Correct answers are in red & bold font. 1. What determines the velocity factor in transmission line? a) The termination impedance b)

2021
Feb
12

Installation and Termination Method of 132 kV Cables and Fiber Optic Cables

Installation and Testing Method of 132 kV Cables and Fiber Optic Cables

The purpose of this document is to specify the procedure for the various activities in the installation of 132 kV cables and fiber optic Cables. The instructions of operation and maintenance manual must be observed for whole of the process for the

2020
Dec
31

UPS Battery Charger Testing Commissioning Method Statement

UPS Battery Charger Testing Commissioning Method Statement

This procedure provides a safe, standardized approach for the initial inspection, checkout, testing, and data documentation of Uninterruptible Power Supply (UPS) and chargers during the commissioning phase. These tests are intended to check the board and its constituent parts for correct operation.

2020
Dec
1

Cable Pulling Laying Installation Termination and Testing Method Statement

Cable Pulling Laying Installation Termination and Testing Method Statement

The purpose of this electrical method statement is to describe the methodology which contractor is adopting during the execution of the cable installation work. Further following this method will ensure that work is done in controlled and safe manner as per project

error: Content is protected !!