What Are Cable Trays? An assembly of units/sections with associated fittings that form a rigid structural system to securely fasten or support cables. Think of a roadway bridge that supports traffic. Cable Tray Systems must provide protection to life & property against
Read More
Below is given a brief method statement for Installation of Isolated Power Supply units or also called IPS Units. Pre installation requirements before commencing the installation work at site are: Operative to attend any site induction provided by the client. Check the
Read More
Installation of capacitor bank shall be carried out in accordance to project specifications and approved drawings and technical submittals etc. Installation will be carried out by skilled and suitably experienced electricians under supervision of highly competent site supervisors and engineers to ensure
Read More
To protect cables from physical damage and the environment, store indoors and protect from moisture, construction equipment, falling objects, chemical spills, moving vehicles, and other hazards. When the cables are received inspect the protective covering on the cable for evidence of shipment
Read More
The purpose of this method statement is to define the sequence and methodology for the installations of Automatic Transfer Switches and bypass-isolation switch ATS & BPS. Prior to commencement of work, shop drawing will be processed and submitted for approval by the
Read More
What is Electrical Trunking? Trunking is an enclosure provided for the protection of cables which is normally square or rectangular in cross-section, having one removable side. Cables trunking may be thought of as simply a larger and more accessible conduit system. The
Read More