2021
Feb
12

Installation and Termination Method of 132 kV Cables and Fiber Optic Cables

Installation and Testing Method of 132 kV Cables and Fiber Optic Cables

The purpose of this document is to specify the procedure for the various activities in the installation of 132 kV cables and fiber optic Cables. The instructions of operation and maintenance manual must be observed for whole of the process for the

2020
Dec
31

UPS Battery Charger Testing Commissioning Method Statement

UPS Battery Charger Testing Commissioning Method Statement

This procedure provides a safe, standardized approach for the initial inspection, checkout, testing, and data documentation of Uninterruptible Power Supply (UPS) and chargers during the commissioning phase. These tests are intended to check the board and its constituent parts for correct operation.

2020
Dec
1

Cable Pulling Laying Installation Termination and Testing Method Statement

Cable Pulling Laying Installation Termination and Testing Method Statement

The purpose of this electrical method statement is to describe the methodology which contractor is adopting during the execution of the cable installation work. Further following this method will ensure that work is done in controlled and safe manner as per project

2020
Oct
18

Cable Tray Trunking & Ladder Installation Method for Projects

Cable Tray Raceway Fill and Load Calculations

The purpose of this article is to define the sequence and methodology for the installation of electrical cable trays, cable trunking, cable raceways and boxes, junction and pull boxes. The method gives details of how the work will be carried out and

2020
Sep
4

Method Statement For Installation Testing and Commissioning Of MATV Distribution System

Installation Testing and Commissioning Of MATV Distribution System

This electrical method statement covers the installation, testing and commissioning procedure for the master antenna or MATV Distribution system. All the materials will be as approval from the consultant engineer and installation & routing will be as per the shop drawings approvals