The purpose of this procedure is to ensure that all works regarding electrical junction box and supports installation for electrical instrumentation works shall be done in accordance with the applicable local standards and all other applicable international codes and standards. Scope of
Read More
Prior to commencement of work, all shop drawings will be submitted for approval by consultant/client. Shop drawings will show the layout of pipe and cables as well as the section drawings. Only approved shop drawing will be used for installation. All materials
Read More
All material used at the project site shall be approved prior to the start of IP Telephony system installation works. Materials and documentation relevant to a particular section of works will be checked by the site/project engineer prior to the commencement of
Read More
Purpose of this method statement is to outline the sequences and methods of works intended to be used for for laying underground 33 kV power and fiber optic cables including the excavation of trench and backfilling. The electrical contractor has the right
Read More
What is a wiring circuit and its components? Two or more conductors (wires) through which a current flows from a source to one or more outlets. The source is where the electrical current originates within the house. Usually the breaker box or
Read More
The purpose of this method statement is to define the sequence and working methodology of the positioning and installation of UPS system especially Chloride 80 Net System. Upon receipt of the UPS system and accessories at site, necessary precautions shall be taken
Read More