2023
May
12

Electrical Junction Box Installation Method Statement

Electrical Junction Box Installation Method Statement

The purpose of this procedure is to ensure that all works regarding electrical junction box and supports installation for electrical instrumentation works shall be done in accordance with the applicable local standards and all other applicable international codes and standards. Scope of

2023
Apr
7

MV, LV, ELV & Telecom Cable Pulling and Installation Method for Infrastructure Projects

Cables & Wires Handling Storage and Pulling Method Statement Procedure

Prior to commencement of work, all shop drawings will be submitted for approval by consultant/client. Shop drawings will show the layout of pipe and cables as well as the section drawings. Only approved shop drawing will be used for installation. All materials

2022
Sep
15

Types of Commercial and Home Wiring / Light Switch Wiring

SPDT Light Switching Circuit Diagram

What is a wiring circuit and its components? Two or more conductors (wires) through which a current flows from a source to one or more outlets. The source is where the electrical current originates within the house. Usually the breaker box or

error: Content is protected !!