2021
Oct
19

Electrical Isolation in Distribution Board Safework Procedure

The purpose of this method is to highlight safe working practices for electrical isolation which is similar as lock out tag out. Operators must wear necessary PPE as required by local conditions and task specific risk assessment. Before start of the electrical

2021
Sep
21

Solar Panel Installation Methods on Roof Top

Ballasted Structure for Solar Panels Installation

When doing solar panel installation on roof tops there are structural considerations to be investigated and analyzed. Solar panels can be placed on new or existing buildings. Solar panels can easily and inexpensively be incorporated at the time of design for new

2021
Jul
10

Security System Installation Procedure Including CCTV Installation

This electrical installation procedure covers the nature and type of work for Security System installation as per approved material submittal, site requirements and manufacturers’ recommendations. Method also covers frequency of which the site inspections are to be carried out. Electrical project and

error: Content is protected !!