2022
Jul
29

Electrical Testing and Commissioning General Requirements & Checklists

electrical testing and commissioning requirements

All electrical checks and tests shall be conducted as per the manufacturer’s drawings/manuals, relevant codes of installation and below given commissioning check lists. The electrical installer/contractor shall also carry out additional tests if called for in the project electrical specifications. Contractor shall

2022
Jun
7

Technical Requirements for Lighting System Installation Work

Light Fixture Installation Electrical Method Statement

The lighting system installation work shall cover the supply and installation of lighting system equipment such as Main lighting distribution boards (MLDBs), lighting distribution boards (LDBs), receptacles, light control switches, ceiling fans, lighting wires, conduits, junction boxes, lighting poles, towers, etc. Lighting

2022
Jun
4

Method Statement for Underground Earthing Works

clamping of the earthing cables

This method is to describe the minimum requirements for earthing conductor installation including materials receiving, storing, and installation. The electrical procedure will ensure that the requirements of underground earthing installation works are met in accordance to the codes requirements and contract specifications.

2022
May
10

Earthing System Concept Components and Types

method statement for earthing system installation pdf

All the people living or working in residential, commercial and industrial installations, particularly the operators and personnel who are in close operation and contact with electrical systems and machineries, should essentially be protected against possible electrification. To achieve this protection, earthing system

2022
Mar
9

Horizontal Directional Drilling Method for Underground Trenchless Cabling Installation

Reaming in Progress

Horizontal Directional Drilling is a guided horizontal boring system capable of installing utilities such as steel pipes and underground cables. Its primary application is in developed areas where surface disruption is a serious consideration, not only because of cost but also because

2021
Nov
16

PVC Electrical Conduit Installation Method for Surface Slab and Walls

PVC Electrical Conduit Installation Method for Surface Slab and Walls

This document defines the methods to be used to ensure that the electrical works to be conducted at a project site are in compliance with the approved designs and approved materials. The method of statement covers the procedure for Material Delivery Inspection,